Epoxy Floors Professionally Installed

Get a professionally installed epoxy floor designed to last. Our commercial grade epoxy system is not a DIY off the shelf kit. 

Epoxy Floors

3 Day Epoxy Floor Installation

Our crew arrives on the scheduled start date. DAY 1: the concrete is prepped, first epoxy layer is applied, and flake is applied. DAY 2: Excess flake is cleared, floor is inspected, flaws are corrected, and second layer of epoxy is applied. DAY 3: A Urethane topcoat is applied to protect the epoxy and provide traction.

Scroll to Top